Planning applications · Virginia, Co. Cavan

Planning applications in Virginia: 70 in three years

70 planning applications were lodged within 2 km of the centre of Virginia in the last three years, 3 of them for ten homes or more (111 units). Here they are, and what to check around a specific house.

Figures compiled from the public records listed at the foot of this page. Data snapshot: . Updated when the records change.

Check one house in Virginia

70 planning applications within 2 km of Virginia in three years, 3 for ten homes or more.

One specific house in Virginia: planning applications within 300 m of that Eircode, the house's own planning file, flood zone, radon, BER, sale history. Thirty-eight checks in all, each linked to the public record.

€19.99, free snapshot first. No account.

Or read the sample report first: a real house, 16 pages.

70

planning applications within 2 km of the centre since 2023

3

of them for 10 homes or more

111

residential units in those large applications

What is being proposed in Virginia

The largest recent applications within 2 km of the centre, from the national planning register:

  • 24 units, lodged 2025-08, application finalised (Cavan County Council): to Construct 26 no. Age Friendly dwellings and 1 no. single storey Communal Building comprising of the following: (A) 12 no. 2 bed Single storey Semi-detached dwellings, (B) 8 no. 3 bed Dormer Semi-detached dwellings, (C
  • 75 units, lodged 2024-12, application finalised (Cavan County Council): to construct 78 no. dwellings and 1 no. single storey creche to complete existing residential development known as “The Drumlins". (“The Drumlins” development was previously approved planning application ref. no.'s 04/21
  • 12 units, lodged 2024-12, application finalised (Cavan County Council): to Construct 12 no. dwellings comprising of the following: (A) 6 no. 4 bed two storey semi-detached dwellings (B) 6 no. 3 bed two storey semi-detached dwellings, (C) form connections to all public services, form entrance

A count for the whole town says how busy the planning office is. What matters for a purchase is the 300 m around the house: the field behind it, the corner site, the neighbour’s attic conversion. That is what the report lists, with the decision and the appeal status for each file.

What to check before you bid

Three things. First, permissions granted but not yet built near the house: the register shows them, the street does not. Second, whether the house itself has a planning file: an extension without permission is a title problem your solicitor has to fix before closing. Third, the zoning in the development plan for the fields around it. The report covers all three for one Eircode.

Also for Virginia

Other checks for Virginia

GuidePlanning search before buying a house: the three files that matter

Questions people ask

How do I check planning applications near a house in Virginia?
The National Planning Application Map on MyPlan.ie maps every application since about 2010. Search the address, then look at the streets around it, not only the plot. Applications within 300 m are the ones that change your view, your light and your parking. The report lists them for the exact Eircode with status and decision.
Is a lot being built in Virginia?
70 applications were lodged within 2 km of the town centre in the last three years, 3 of them for ten or more homes (111 units in total). A modest pipeline, mostly one-off houses and extensions.
Does a planning application nearby affect the price?
A granted permission for a large scheme next door can cut what a house is worth and can also mean two years of noise. It can also raise prices if it brings a school or a shop. Read the description, the decision and the appeal status. The report gives you that for everything within 300 m.

Sources

Area figures, compiled from public records. They describe the town or county, not any one house. The paid report checks the exact Eircode.